ISS Operations Update – May 18, 2016

Photo: NASA
Photo: NASA
Experiments:

Wet Lab RNA SmartCycler Experiment Session [The Wetlab RNA SmartCycler provides real-time quantitative gene expression analysis aboard ISS, enabling genomic studies in the unique space environment.]

Dose Tracker [Dose Tracker uses logs kept by crew members on the frequency of medication intake before, during and after a mission also with regards to side effect qualities frequencies and severities. This data is needed to address theories of medication ineffectiveness during flight and unusual side effects experienced in the flight environment.]

Habitability [Assessment of International Space Station Vehicle Habitability will see teams on the ground study video of the behavior of crew members within the habitable environment of ISS while the crew fills out questionnaires and collects video of areas of interest in order to provide an assessment of the habitability of ISS in its current state for a one-year mission. Results will be used to develop spacecraft with improved habitability properties to allow crew members to optimally utilize the onboard space.]

Rodent Research 3 – Bone Density Measurements & Sample Harvesting [Rodent Research 3, named after the sponsoring company Eli Lilly and Co., will conduct a close study of myostatin inhibition for the prevention of sekeletal muscle atrophy and weakness in mice during long-duration spaceflight. A rapid loss of bone and muscle mass is observed in astronauts during spaceflight, especially to the legs and spine at rates similar to atrophy in people with muscle-wasting deseases on Earth. The study makes use of mice as a model organism to examine the response to certain drugs preventing muscle or bone loss.]

WinSCAT Experiment Session [MedOps WINSCAT (Spaceflight Cognitive Assessment Tool for Windows) is a computer based psychological evaluation that investigates concentration, verbal working memory, attention, short-term memory, spatial processing, and math skill of humans exposed to microgravity for extended periods of time.]

Study of cardiovascular system under graded physical load on Cycle Ergometer

Other Activities:

Nominal Inspections/Servicing Tasks (Morning Inspection, Caution & Warning Panel Check, Sozh System Maintenance) (Russian Crew)

Urine Processing Assembly (UPA) Fault: UPA transitioned to shutdown mode likely due to belt slippage inside the distillation assembly. This is a known issue and assessments are underway while UPA has been configured to use the EDV tank for waste collection.

Environmental Health System (EHS) Microbial Air and Surface Sampling

LAB Forward (Fwd) Starboard (Stbd) Inter-Module Ventilation (IMV) Cleaning

Private Medical Conference

X