Falcon 9 – Countdown Timeline
This timeline is for the retired Falcon 9 v1.1 launch vehicle, see the Falcon 9 FT Countdown for the modified vehicle’s countdown procedure.
Time | Event |
---|---|
L-10:00:00 | Falcon 9 to Vertical |
L-8:30:00 | Countdown Initiation, Launch Vehicle Power-Up |
L-6:00:00 | First Weather Balloon Release |
L-5:00:00 | Launch Area Evacuation |
L-4:45:00 | Range Controllers on Station |
L-4:35:00 | Falcon 9 Attitude Control System N2 Loading |
L-4:50:00 | Falcon 9 Reconfiguration for Propellant Loading |
L-4:37:00 | GO for Propellant Loading |
L-4:20:00 | Rocket Propellant 1 Loading |
L-4:00:00 | Eastern Range Countdown Initiation |
L-4:00:00 | LOX Systems Setup & Chilldown Ops |
L-3:45:00 | LOX Loading |
L-2:45:00 | Falcon 9 RF & Telemetry Checks |
L-2:30:00 | Falcon 9 Launch Vehicle Release System Test |
L-2:25:00 | TEA-TEB Bleed In |
L-2:00:00 | RP-1 Tanking complete |
L-1:45:00 | Comm & FTS Checks |
L-1:40:00 | Data Flow Tests with Downrange Tracking Stations |
L-1:30:00 | LOX Replenish |
L-1:00:00 | Weather Briefing |
L-0:50:00 | RF Link Checks |
L-0:45:00 | Flight Control System Setup (Flight Software Loading) |
L-0:30:00 | Final LOX Topping |
L-0:27:00 | Spacecraft to Internal Power |
L-0:13:00 | COUNTDOWN HOLD POINT |
L-0:13:00 | Launch Director Poll |
L-0:11:00 | Terminal Count Briefing |
T-0:10:00 | Terminal Countdown |
T-0:09:55 | Verify that Terminal Countdown has started |
T-0:09:50 | Range Recorders Start |
T-0:09:45 | Launch Enable to Flight Mode |
T-0:09:30 | First Stage Merlin Engine Chilldown, Pre Valves to Open |
T-0:09:20 | Ground TEA-TEB Setup |
T-0:09:17 | Merlin 1D: Lox Bleeder Valves Open |
T-0:08:15 | Engine Trim Valve Cycling |
T-0:07:30 | Go/No Go for Launch |
T-0:07:00 | Spacecraft on Internal Power |
T-0:07:00 | First Stage Heater Shutdown |
T-0:07:00 | First Stage ACS Close-Out |
T-0:06:35 | Second Stage Heater Shutdown |
T-0:06:25 | Falcon 9 to Internal Power |
T-0:06:00 | Transfer to Internal complete |
T-0:05:55 | Pressurization for Strongback Retract |
T-0:05:30 | Strongback Cradles Opening |
T-0:05:00 | Second Stage Nitrogen Loading Termination |
T-0:04:46 | Stage 1 & Stage 2 Auto Sequence starts |
T-0:04:30 | Stage 2 Thrust Vector Control Test |
T-0:04:25 | Strongback Retraction |
T-0:04:10 | Vehicle Release Auto Sequence |
T-0:03:45 | Verify Good Mvac TVC |
T-0:03:40 | TEA-TEB Ignition System Activation |
T-0:03:30 | Strongback Retraction complete |
T-0:03:25 | Flight Termination System to Internal Power |
T-0:03:05 | Flight Termination System Armed |
T-0:03:00 | LOX Topping Termination |
T-0:03:00 | Strongback Securing complete |
T-0:02:45 | Fuel Trim Valve to Flight Position |
T-0:02:40 | FTS Countdown Sequence |
T-0:02:30 | Launch Director: Go for Launch |
T-0:02:20 | Propellant Tank Pre-Press |
T-0:02:00 | Range Verification |
T-0:02:00 | Flight Control to Self Alignment |
T-0:01:35 | Helium Loading Termination |
T-0:01:30 | Final Engine Chilldown, Pre-Valves/Bleeders Open |
T-0:01:20 | Engine Purge |
T-0:01:00 | Flight Computer to start-up |
T-0:01:00 | Pad Deck Water Deluge System Activation |
T-0:00:55 | Second Stage to Flight Pressure |
T-0:00:50 | First Stage Thrust Vector Actuator Test |
T-0:00:40 | First Stage to Flight Pressure |
T-0:00:20 | All Tanks at Flight Pressure |
T-0:00:15 | Arm Pyrotechnics |
T-0:00:10 | Latest VC Abort |
T-0:00:03 | Merlin Engine Ignition |
T-0:00:00 | LIFTOFF |