PSLV C37 Flight Profile

Image: ISRO
Image: ISRO
Launch Info

Launch Vehicle: PSLV XL
Launch Site: FLP, Satish Dhawan
Launch Date: February 15, 2017
Launch Time: 03:58 UTC

Payload: 104 Satellites (1378kg)

Mission Duration: 28 Minutes & 43 Seconds

Target Orbit

Type: Sun Synchronous Orbit
Altitude: 505 Kilometers
Inclination: 97.46°

 

Event Time Altitude (km) Velocity (m/s)
PS1 Ignition 0:00.00.0 0.024 451.89
Booster 1&2 Ignition 0:00.00.42 0.024 451.89
Booster 3&4 Ignition 0:00.00.62 0.024 451.89
Booster 5&6 (Air-Lit) Ignition 0:00.25.0 2.761 575.97
Booster 1&2 Separation 0:01:09.9 26.457 1319.92
Booster 3&4 Separation 0:01:10.10 26.611 1324.52
Booster 5&6 Separation 0:01.32.0 46.295 1858.84
PS1 Separation 0:01:50.88 67.241 2165.97
PS2 Ignition 0:01:51.08 67.461 2165.16
Payload Fairing Separation 0:02:38.28 116.975 2457.93
PS2 Separation 0:04:22.92 218.846 4045.16
PS3 Ignition 0:04:24.12 220.068 4047.94
PS3 Separation 0:08:12.22 428.300 5834.03
PS4 Ignition 0:08:22.22 435.029 5824.10
PS4 Cutoff 0:16:47.80 509.563 7605.59
CartoSat-2D Separation 0:17:29.80 510.383 7609.52
INS-1A Separation 0:17:39.80 510.590 7609.42
INS-1B Separation 0:17:40.30 510.601 7609.41
CubeSat Separation Sequence 0:18:32.80 511.719 7608.96
Satellite Separation Complete 0:28:42.80 524.075 7602.96

Image: ISRO
Image: ISRO