GSLV Mk.III D1 Launch Profile (GSAT-19)

Launch Data

Launch Vehicle: GSLV Mk.III
Launch Site: SLP, Satish Dhawan Space Center
Launch Date: June 5, 2017
Launch Time: 11:58 UTC
Launch Azimuth; 107°
Payload: GSAT-19 (3,136 kg)

Ascent Duration: 16 Minutes & 20 Seconds

Target Orbit:
Type: Geostationary Transfer Orbit
Perigee: 170 km
Apogee: 35,975 km
Inclination: 21.5°

Credit: ISRO

Time Event Altitude (km) Velocity (m/s)
T+0:00:00 S200 Booster Ignition & Liftoff 0.024 451.9
T+0:01:56 L110 Core Stage Ignition 41.037 1635.1
T+0:02:20 S200 Booster Separation 61.931 1949.4
T+0:03:45 Payload Fairing Jettison 115.957 2728.77
T+0:05:17 L110 Core Stage Shutdown 166.361 4397.49
T+0:05:20 L110 Core Stage Separation 168.281 4429.55
T+0:05:22 C25 Cryogenic Upper Stage Ignition 169.914 4429.11
T+0:16:05 C25 Upper Stage Shutdown 174.619 10233.27
T+0:16:20 GSAT-19 Satellite Separation 179.146 10260.10

Credit: ISRO