Launch Profile - Falcon 9 - Iridium-NEXT Flight 5
Time | Event |
---|---|
T-0:00:03 | Merlin Engine Ignition |
T-0:00:00 | Liftoff |
T~0:00:17 | Pitch Kick & Roll Maneuver |
T~0:01:11 | Mach 1 |
T+0:01:16 | Maximum Dynamic Pressure, Throttle Down |
T~0:01:40 | Stage 2 - Merlin Vac Engine Chilldown |
T+0:02:34 | MECO - First Stage Cutoff |
T+0:02:37 | Stage Separation |
T+0:02:39 | Mvac Ignition |
T+0:03:28 | Payload Fairing Jettison |
T+0:08 | 2nd Stage Flight Termination System safe |
T+0:08 | 2nd Stage Terminal Guidance Mode |
T+0:09:02 | 2nd Stage Engine Shutdown |
T+0:52:05 | Second Stage Re-Start |
T+0:52:16 | Second Stage Cutoff |
T+0:57:16 | Iridium Separation Sequence |
T+1:12:03 | S/C Separation Complete |
Launch Data
Launch Vehicle: Falcon 9 FT
Launch Site: SLC-4E Vandenberg, California
Launch Date: March 30, 2018
Window: 14:13:51 UTC
Payload: 10 Iridium-NEXT (9,600kg)
Ascent Duration: 72 Minutes
Backup: March 31, 2018 - 14:08 UTC
First Stage Recovery: No (Post-Sep Testing)
Fairing Recovery Attempt: Yes (Mr. Steven)
Target Orbit:
Type: Non-Synchronous Transfer Orbit
Perigee: 615 Kilometers
Apogee: 625 Kilometers
Inclination: 86.66°