Soyuz MS-05 Landing Profile
Landing Date: December 14, 2017
Mission Duration: 138 Days 16 Hours
Soyuz Hatch Closure: 2:00 UTC
Undocking: 5:14 UTC
Deorbit Burn: 7:44 UTC
Landing: 8:38 UTC
Landing Site: 147km S-E of Zhezkazghan
Crew:

Image: NASA
UTC | Undock +/- | Landing +/- | Event |
---|---|---|---|
Soyuz Loading Complete | |||
Communication Reconfig for Undock | |||
Comm Checks | |||
Soyuz Activation | |||
02:00:00 | -03:14:30 | Hatch Closure | |
Interface Leak Checks | |||
Soyuz Transfer to Autonomous Power | |||
05:12:00 | -00:02:30 | ISS Control to Fine Attitude Hold | |
05:13:00 | -00:01:30 | Command Undocking Sequence | |
05:14:30 | 00:00:00 | Physical Separation | |
05:15:10 | +00:01:40 | LVLH Snap&Hold | |
05:16:30 | +00:02:00 | Range: 20 Meters; Sep. Burn #1 | |
07:44:59 | +02:30:29 | -0:53:29 | Deorbit Burn Duration: 4:40, dV: 128.0m/s |
07:49:39 | +02:35:09 | -0:48:49 | End Deorbit Burn (413.3km, 7.24km/s) |
08:04:07 | +02:49:37 | -0:34:21 | Equator Crossing (404.5km) |
08:12:14 | +02:57:44 | -0:26:14 | Module Separation (139.9km, 7.57km/s) |
08:15:07 | +03:00:37 | -0:23:21 | Entry Interface (99.5km, 7.62km/s) |
08:16:38 | +03:01:08 | -0:21:50 | Entry Guidance enabled (80.1km, 7.62km/s) |
08:21:34 | +03:07:04 | -0:16:54 | Peak G Load - 4.09G (32.9km, 2.09km/s) |
08:23:28 | +03:08:58 | -0:15:00 | Parachute Opening (10.7km, 218m/s) |
Re-Hook to symmetric descent | |||
Heat Shield Jettison, Port Hole Cover Sep | |||
Hydrogen Peroxide Vent | |||
Pressure Equalization | |||
08:38:27 | +03:23:57 | -0:00:01 | Soft Landing Engine Ignition |
08:38:28 | +03:23:58 | 00:00:00 | TOUCHDOWN |
10:38 | ~+05:24 | ~+02:00 | Crew departs Landing Site |

Image: TsUP/Roscosmos