Soyuz MS-02 Flight Profile
Launch Profile
Time | Event |
---|---|
T-00:20.00 | Ignition Sequence Start |
T-00:20.00 | Core Stage Umbilical Separation |
T-00:15.00 | Intermediate Thrust Level |
T-00:10.00 | Turbopumps at Flight Speed |
T-00:05.00 | Full Thrust Level |
T+00:00.00 | Fueling Towers Retract |
T+00:00.00 | LIFTOFF |
T+01:54.16 | SAS Abort System Mode Switch, Tower Jettison |
T+01:57.80 | Strap-On booster Separation |
T+02:33.48 | Launch Shroud Jettison |
T+04:45.05 | Core Stage Shutdown |
T+04:47.30 | Stage Separation & Third Stage Ignition |
T+04:57.30 | Third Stage Aft Section Cover Jettison |
T+08:45.08 | Third Stage Cutoff |
T+08:48.38 | Spacecraft Separation |
Solar Panel Deployment | |
Communication Antenna Deployment | |
Mission handed over to MCC Moscow | |
Successful Orbital Insertion |
Orbital Data
Launch Date: October 19, 2016
T-0 Time: 08:05:14 UTC
Docking: October 21, 2016
Time: 09:59:09 UTC
Docking Port: Poisk
Soyuz Insertion Orbit:
Perigee: 200 Kilometers (+7 / -22 km)
Apogee: 242 Kilometers (+/-42 km)
Inclination: 51.66 Degrees (+/-0.058°)
Period: 88.64 Minutes (+/-0.367min)
Phase Angle (to ISS): 289.0 Degrees
Space Station Orbit:
Orbit: 399 by 409 Kilometers
Inclination: 51.64 Degrees
Period: 92.65min
T-0 Time: 08:05:14 UTC
Docking: October 21, 2016
Time: 09:59:09 UTC
Docking Port: Poisk
Soyuz Insertion Orbit:
Perigee: 200 Kilometers (+7 / -22 km)
Apogee: 242 Kilometers (+/-42 km)
Inclination: 51.66 Degrees (+/-0.058°)
Period: 88.64 Minutes (+/-0.367min)
Phase Angle (to ISS): 289.0 Degrees
Space Station Orbit:
Orbit: 399 by 409 Kilometers
Inclination: 51.64 Degrees
Period: 92.65min

Image: Roscosmos/TSUP
Rendezvous Profile
Event | Date | Time UTC |
---|---|---|
Liftoff | Oct. 19, 2016 | 08:05:14 |
Orbital Insertion | Oct. 19, 2016 | 08:14:02 |
Solar Array & KURS Antenna Deploy | Oct. 19, 2016 | 08:14:10 |
Ground Station Loss of Signal | Oct. 19, 2016 | 08:21 |
Rendezvous Burn 1 (dV: 24.88m/s; dt: 62.1s) | Oct. 19, 2016 | 11:46:01 |
Rendezvous Burn 2 (dV: 25.76m/s; dt: 63.8s) | Oct. 19, 2016 | 12:41:49 |
Target Orbit: 259.8 x 348.1 km | Oct. 19, 2016 | 12:42:15 |
Rendezvous Burn 3 (dV: 2.00m/s; dt: 29.0s) | Oct. 20, 2016 | 09:16:22 |
Target Orbit: 266.2 x 347.4 km | Oct. 20, 2016 | 09:16:50 |
Automated Rendezvous Initiation | Oct. 21, 2016 | 07:34:48 |
ISS Handover to Russian Segment Control | Oct. 21, 2016 | 07:35:00 |
ISS Maneuver to Docking Attitude | Oct. 21, 2016 | 07:40:00 |
Rendezvous Burn 4 (30m/s) | Oct. 21, 2016 | 07:56:27 |
VHF-2 Voice Link Established (Range: 200km) | Oct. 21, 2016 | 08:16 |
Rendezvous Burn 5 | Oct. 21, 2016 | 08:18 |
KURS-P System Activation | Oct. 21, 2016 | 08:22 |
KURS-NA System Activation | Oct. 21, 2016 | 08:23 |
Rendezvous Burn | Oct. 21, 2016 | 08:44 |
KURS-P Validation, Range: 80km | Oct. 21, 2016 | 08:47 |
Range: 33km; Range Rate: 45m/s | Oct. 21, 2016 | 09:00 |
Range: 20km; Range Rate: 31m/s | Oct. 21, 2016 | 09:05 |
KURS A&P Test, Range: 15km | Oct. 21, 2016 | 09:07 |
Luch-5B Acquisition of Signal | Oct. 21, 2016 | 09:08 |
Range: 13km; Range Rate: 12m/s | Oct. 21, 2016 | 09:10 |
Orbital Sunrise | Oct. 21, 2016 | 09:11 |
ISS Inhibits: RapidScat & SCAN Testbed | Oct. 21, 2016 | 09:14 |
TV System Activation, Range: 8km | Oct. 21, 2016 | 09:15 |
Range: 5km | Oct. 21, 2016 | 09:20 |
Rendezvous Impulse | Oct. 21, 2016 | 09:23 |
Ballistic targeting Point | Oct. 21, 2016 | 09:24:48 |
Rendezvous Impulse | Oct. 21, 2016 | 09:25 |
Rendezvous Impulse | Oct. 21, 2016 | 09:29 |
Rendezvous Impulse | Oct. 21, 2016 | 09:32 |
Flyaround Initiation | Oct. 21, 2016 | 09:35:13 |
Luch-5V Acquisition of Signal | Oct. 21, 2016 | 09:41:00 |
Stationkeeping | Oct. 21, 2016 | 09:44:51 |
Ground Station Acquisition of Signal | Oct. 21, 2016 | 09:46:00 |
Final Approach | Oct. 21, 2016 | 09:48:33 |
ISS Inertial Snap & Hold | Oct. 21, 2016 | 09:50:00 |
DOCKING - Free Drift | Oct. 21, 2016 | 09:59:09 |
Luch-5B Loss of Signal | Oct. 21, 2016 | 10:02:00 |
Hooks Closed - Safe Docking Mode | Oct. 21, 2016 | 10:05 |
Ground Station Loss of Signal | Oct. 21, 2016 | 10:09 |
Orbital Sunset | Oct. 21, 2016 | 10:15 |
Leak Checks | Oct. 21, 2016 | 10:20 |
Luch-5V Loss of Signal | Oct. 21, 2016 | 10:38 |
ISS to USOS Control | Oct. 21, 2016 | 10:40 |
Hatch Opening | Oct. 21, 2016 | 12:35 |
---Docking Complete--- | Oct. 21, 2016 |

Image: Roscosmos/TSuP
Standard 34-Orbit Rendezvous
Orbit | Activity |
---|---|
1 | Solar Panel Deployment |
Communications Antenna Deployments | |
Crew monitors Systems Health | |
Manual Deactivation of Entry Thermal Sensors | |
SKD Propulsion System Pressurization | |
Tracking Data Update | |
2 | Systems Checkout: Attitude Sensors, KURS, TV System |
SKD Propulsion System Checkout | |
Manual Attitude Control Test | |
Crew monitors Systems Health | |
Orbital Module Ingress | |
CO2 Scrubber Activation (OM) | |
Sokol Suit egress | |
TV Downlink of Ascent Telemetry Footage | |
Radar and Radio Transponder Tracking | |
Manual Maneuver to +Y to Sun with 2deg/sec Yaw Rotation | |
3 | Terminate +Y Solar Rotation, Establish LVLH Attitude |
Crew monitors Maneuver to LVLH | |
DV1 and DV2 Burn Data Read-Up | |
Emergency Deorbit Read-up | |
TV Downlink of Telemetry Display Footage | |
Maneuver to DV1 Attitude at TIG-8 Minutes | |
DV1 Phasing Burn during LOS | |
Crew monitors Systems Associated with DV1 | |
4 | Maneuver to DV2 Attitude at TIG-8 Minutes |
DV2Phasing Burn during LOS | |
Crew monitors Systems Associated with DV2 | |
Burn Report at AOS | |
Orbital and Descent Module Pressure Checks | |
Post Burn Form 23 read-Up | |
Radar and Radio Transponder Tracking | |
Manual Maneuver to +Y to Sun with 2deg/sec Yaw Rotation | |
External Boresight TV Camera Operations Check | |
Crew Meal | |
5 | Final FD1 Russian Ground Station AOS |
Report on TV System Checks | |
Sokol Suit Clean-Up | |
TV Downlink of Telemetry Display Footage | |
Radar and Radio Transponder Tracking | |
6-12 | Crew Sleep |
LOS on Russian Ground Stations | |
Emergency Communications via NASA's VHF Network | |
13 | Post Sleep Operations |
Pressure Checks of Modules | |
Form 14 Revisions | |
Radar and Radio Transponder Tracking | |
TV Downlink of Ascent Telemetry Footage | |
14 | Config of the RHC-2/THC-2 Work Station in Orbital Module |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
15 | THC-2 Manual Control Test |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
16 | Crew Meal |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
17 | Terminate +Y Solar Rotation, Establish LVLH Attitude |
RHC-2 Test | |
Burn Data Uplink | |
TV Downlink of Telemetry Display Footage | |
Maneuver to Burn Attitude | |
Rendezvous Burn during LOS | |
Manual Maneuver to +Y to Sun with 2deg/sec Yaw Rotation | |
18 | Burn Report and Re-Orientation Maneuver |
Pressure Checks of Modules | |
Post Burn Form 23 read-Up | |
TV Downlink of Telemetry Display Footage | |
Radar and Radio Transponder Tracking | |
19 | CO2 Scrubber Cartridge Replacement |
Free Time | |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
20 | Free Time |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
21 | Final FD2 Russian Ground Station AOS |
Free Time | |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
22-27 | Crew Sleep |
Emergency Communications via NASA's VHF Network | |
28 | Post Sleep Operations |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
29 | Pressure Checks of Modules |
Free Time | |
Predicted Post-Burn Read-Ups - Form 14 and 23 | |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
30 | Free Time |
Crew Meal | |
Form 2 Correction Read-Up 'Globe Correction' | |
Rendezvous Timeline Uplink | |
Radar and Radio Transponder Tracking | |
TV Downlink of Telemetry Display Footage | |
31 | Sokol Suit Donning |
Entry Module Ingress | |
Hatch Closure | |
Sate Vector Uplinks | |
TV Downlink of Telemetry Display Footage | |
Radio Transponder Tracking | |
32 | Terminate +Y Solar Rotation, Establish LVLH Attitude |
Auto Rendezvous Sequence Initiation | |
Crew monitors LVLH Re-Orientation | |
TV Downlink of Telemetry Display Footage | |
Radio Transponder Tracking | |
33 | Fly Around |
Stationkeeping | |
Crew monitors Systems health | |
Communications Relayed via ISS | |
Form 14 and 23 Updates | |
TV Downlink of Telemetry Display Footage | |
Radio Transponder Tracking | |
34 | Final Approach and Docking |
Capture to Docking Sequence | |
Crew monitors Docking, Interface Pressure Seal | |
Orbital Module Ingress | |
Sokol Suit Doffing | |
TV Downlink of Telemetry Display Footage | |
Radio Transponder Tracking | |
35 | ISS/Soyuz Pressure Equalization |
Report all Pressures | |
ISS Ingress | |
Telemetry Playback | |
Radio Transponder Tracking |