Atlas V - SBIRS-GEO 4 - Launch Profile
Launch Timeline
Time | Event |
---|---|
T-0:00:02.7 | Stage 1 - RD-180 Ignition |
T-0 | Booster Ignition |
T+0:00:01.1 | Liftoff |
T+0:00:02.1 | Full Thrust Level |
T+0:00:06.8 | Pitch/Roll Maneuver Initiation |
T+0:00:57.9 | Mach 1 |
T+0:01:11:2 | Maximum Dynamic Pressure |
T+0:02:20:5 | SRB Jettison |
RL-10C Boost Phase Cool-Down | |
Centaur RCS Pyro Valve Initiation | |
Stage 1 Throttle down for MECO | |
T+0:04:03.3 | Main Engine Cutoff |
T+0:04:09.3 | Atlas/Centaur Separation |
T+0:04:19.2 | Centaur Ignition 1 - Burn Duration: 09:30.7 |
T+0:04:27.3 | Payload Fairing Jettison |
T+0:13:49.9 | Centaur Cutoff 1 |
T+0:13:49.9 | Coast Phase - Duration: 10:26.9 |
T+0:24:16.8 | Centaur Ignition 2 - Burn Duration: 5:01.8 |
T+0:29:18.6 | Centaur Cutoff 2 |
T+0:42:31.6 | SBIRS GEO-4 Separation |
Centaur CCAM, Coast Phase | |
T+1:14:17.2 | Centaur Deorbit Burn |
T+1:14:27.2 | Centaur Shutdown |
T+9:24:57.1 | Ocean Impact |
Launch Data
Launch Vehicle: Atlas V 401
Launch Site: SLC-41 Cape Canaveral
Launch Date: January 20, 2018
Window: 00:48-01:28 UTC
Payload: SBIRS-GEO 4 (~4,500kg)
Window: 00:48-01:28 UTC
Payload: SBIRS-GEO 4 (~4,500kg)
Flight Azimuth: 95.9°
Target Orbit:
Type: Geostationary Transfer Orbit
Perigee: 185.2 Kilometers
Apogee: 35,851 Kilometers
Inclination: 16.88 Degrees
Apogee: 35,851 Kilometers
Inclination: 16.88 Degrees
Argument of Perigee: 178.0°

Image: ULA
Ground Track Map

Credit: United Launch Alliance