Atlas V - MUOS 5 - Launch Profile

Launch Timeline

Time Event
T-0:00:02.7 Stage 1 - RD-180 Ignition
0:00:00:00 Booster Ignition
T+0:00:01.1 Liftoff
T+0:00:02.1 Full Thrust Level
T+0:00:03.9 Pitch/Roll Maneuver Initiation
T+0:00:4x Mach 1
T+0:00:49:3 Maximum Dynamic Pressure
T+0:01:48.7 SRB Separation (1,2)
T+0:01:50.2 SRB Separation (3,4, 5)
T+0:03:27.8 Payload Fairing Jettison
T+0:03:32.8 Forward Load Reactor Jettison
T+0:04:25.6 Stage 1 Cutoff
T+0:04:31.6 Atlas/Centaur Separation
T+0:04:41.5 Centaur Ignition 1 - Burn Duration: 7:46.9
T+0:12:28.4 Centaur Cutoff 1
T+0:12:28.4 Coast Phase
T+0:20:27.6 Centaur Ignition 2 - Burn Duration: 5:46.9
T+0:26:14.5 Centaur Cutoff 2
T+0:26:14.5 Coast Phase
T+2:48:40.4 Centaur Ignition 3 - Burn Duration: 0:58.3
T+2:49:38.7 Centaur Cutoff 3
T+2:53:17.7 MUOS 5 Spacecraft Separation

Target Orbit

Type: Geostationary Transfer Orbit

Perigee: 3,841.7 km

Apogee: 35,706.9 km

Inclination: 19.1°

Launch Azimuth: 94.58°

Image: ULA
Image: ULA
Ground Track Map
Credit: United Launch Alliance
Credit: United Launch Alliance