Soyuz TMA-18M Landing Profile

UTC Undock +/- Landing +/- Event
Soyuz Loading Complete
Communication Reconfig for Undock
Comm Checks
Soyuz Activation
21:40:00 -03:22:30 Hatch Closure
Interface Leak Checks
Soyuz Transfer to Autonomous Power
01:00:00 -00:02:30 ISS Control to Fine Attitude Hold
01:01:00 -00:01:30 Command Undocking Sequence
01:02:30 00:00:00 Physical Separation
01:04:10 +00:01:40 LVLH Snap&Hold
01:05:30 +00:03:00 Range: 20 Meters; Sep. Burn #1
01:06:20 +00:04:20 Separation Burn #2
02:07:00 Sunrise at Landing Site
03:32:43 +02:30:43 -0:52:44 Deorbit Burn Duration: 4:40, dV: 128.0m/s
03:37:23 +02:34:53 -0:48:04 End Deorbit Burn (416.5km, 7.23km/s)
03:50:18 +02:47:48 -0:35:09 Equator Crossing (406.5km)
03:59:59 +02:57:29 -0:25:28 Module Separation (139.9km, 7.57km/s)
04:02:48 +03:00:18 -0:22:39 Entry Interface (100.0km, 7.62km/s)
04:04:19 +03:01:49 -0:21:08 Entry Guidance enabled (80.2km, 7.62km/s)
04:09:13 +03:06:43 -0:16:14 Peak G Load - 3.95G (31.9km, 1.89km/s)
04:11:03 +03:08:33 -0:14:24 Parachute Opening (10.6km, 211m/s)
Re-Hook to symmetric descent
Heat Shield Jettison, Port Hole Cover Sep
Hydrogen Peroxide Vent
Pressure Equalization
04:25:26 +03:22:56 -0:00:01 Soft Landing Engine Ignition
04:25:27 +03:22:57 00:00:00 TOUCHDOWN
~06:25 ~+05:23 ~+02:00 Crew departs Landing Site

Image: NASA
Image: TsUP/Roscosmos