Ariane 5 VA234 Flight Profile (Star One D1, JCSat-15)
Launch Data
Launch Vehicle: Ariane 5 ECA
Launch Site: ELA-3, Guiana Space Center
Launch Date: December 21, 2016
Window: 20:30-21:45 UTC
Payload: Star One D1 & JCSat-15 (10,722kg)
Window: 20:30-21:45 UTC
Payload: Star One D1 & JCSat-15 (10,722kg)
Ascent Duration: 43 Min & 26 Sec
Target Orbit:
Target Orbit:
Type: Geostationary Transfer Orbit
Perigee: 250 Kilometers
Apogee: 35,905 Kilometers
Inclination: 6.0 Degrees
Apogee: 35,905 Kilometers
Inclination: 6.0 Degrees

Ariane 5 Launch Profile - Credit: Arianespace
Time | Event |
---|---|
0:00:00.00 | Vulcain Engine Ignition Sequence |
0:00:07.05 | Solid Rocket Booster Ignition |
0:00:07.30 | LIFTOFF |
0:00:12.70 | Pitch Maneuver |
0:00:17.05 | Roll Maneuver |
0:00:22.60 | Pitch Complete |
0:00:32.05 | Roll Complete |
00:00:49 | Mach 1 |
00:01:08 | Maximum Dynamic Pressure |
00:02:22 | SRB Burnout and Jettison |
00:03:15 | Payload Fairing Jettison |
00:05:xx | Intermediate Point |
00:08:14 | Acquisition by Natal Tracking Station |
00:08:xx | LOS Galliot |
00:08:53 | Core Stage shutdown |
00:08:59 | Stage Separation |
00:09:03 | 2nd Stage Ignition |
00:13:49 | Acquisition by Ascension Tracking Station |
00:18:23 | Acquisition by Libreville Tracking Station |
00:23:05 | Acquisition by Malindi Tracking Station |
00:25:23 | Second Stage Shutdown - Target Orbit: 250 by 35,905km - 6.0° |
00:25:33 | Re-Orientation for Satellite Separation |
00:29:10 | Star One D1 Separation |
00:29:20 | De-Spin |
00:31:58 | Sylda 5 Separation |
00:43:26 | JCSat-15 Separation |
Re-Orientation for Passivation | |
Final Spin-Up | |
LOX Tank Passivation | |
00:59:02 | End of Arianespace Commercial Mission |
01:15:02 | Ariane 5 - End of Mission |

Image: Airbus Defence & Space